The four planned extensions are the 25.9km Bang Sue-Phayathai-Makkasan-Hua Mak section that includes the Bang Sue-Hua Lamphong missing link and requires 49.6 billion baht in funding the 8.84km Rangsit-Thammasat University section that requires 6.6 billion baht in funding the Taling Chan-Salaya section that requires 10.6 billion baht and the 5.7km Taling Chan-Siriraj section that will cost 4.7 billion baht, he said. The two existing sections are the 26.3 kilometre Bang Sue-Rangsit section and the 15.3km Bang Sue-Taling Chan, for which construction costs totalled 108 billion baht, he said. The Red Line network will comprise six sections in total worth 188 billion baht in investment value, two of which have already been constructed and open for free trials since Aug 2, said Khanaphot Wachirakamthon, assistant manager of the Red Line project.